![Mumbai Metro logo](https://metroroutes.in/wp-content/uploads/2023/04/mumbai-metro.webp)
Line-10 or Green Line Mumbai Metro Timings and Station
MMRC
![India flag](https://metroroutes.in/wp-content/uploads/2023/02/Indial-flag-1024x683.webp)
India
![Line-10 Mumbai Metro](https://metroroutes.in/wp-content/uploads/2023/07/Line-6-Mumbai-Metro-1024x386.webp)
Line-10 of Mumbai Metro
Line 10 or Green Line (extension), commonly known as Gaimukh-Shivaji Chowk (Mira Road) corridor, is a section of Mumbai, India’s metro system.
Line 10 stretches 9.2 km (5.7 mi) from Gaimukh to Shivaji Chowk (Mira Road) Metro-10. It has 4 stations and is fully elevated line.It is expected to be completed in 2024 and is expected to provide interconnectivity among Mira-Bhayander, Thane, Borivali and rest of Mumbai. Depending on the state of the roads, the reduction in travel time will range from 50% to 75%.
Line-10 of Mumbai Metro Stations List
Line-10 of Mumbai Metro Quick Info
![Quick info Line-10 Mumbai Metro](https://metroroutes.in/wp-content/uploads/2023/12/Quick-Info.png)