Line-2B or Yellow Line Mumbai Metro Timings and Station
MMRC
India
Line-2B of Mumbai Metro
Line 2B or Yellow Line, is the under construction phase. Its route from DN Nagar to Mandale spans 23.64 Km (14.69 mi) long. It has 20 stations and is equipped with modern amenities such as Wi-Fi, CCTV cameras, and automatic fare collection. It is further divided into 4 packages – ESIC Nagar to Khira Nagar, Saraswat Nagar to ILFS, MTNL Metro to Chembur, and Diamond Garden to Mandale.
Line-2B of Mumbai Metro Stations List
- 1. ESIC Nagar
- 2. Prem Nagar
- 3. Indira Nagar (Vile Parle)
- 4. Nanavati Hospital
- 5. Khira Nagar
- 6. Saraswat Nagar
- 7. National College (Bandra)
- 8. Bandra
- 9. Income Tax Office (BKC)
- 10. ILFS, BKC
- 11. MTNL, BKC
- 12. SG Barve Marg
- 13. Kurla (East)
- 14. Eastern Express Highway
- 15. Chembur
- 16. Diamond Garden
- 17. Shivaji Chowk (Chembur)
- 18. BSNL, Govandi
- 19. Mankhurd
- 20. Mandale
Line-2B of Mumbai Metro Quick Info
Line-2B of Mumbai Metro Interchanges
S.No | Stations | Opening | Connections |
---|---|---|---|
1 | ESIC Nagar | Under Construction | None |
2 | Prem Nagar | Under Construction | None |
3 | Indira Nagar (Vile Parle) | Under Construction | None |
4 | Nanavati Hospital | Under Construction | None |
5 | Khira Nagar | Under Construction | Santacruz on Western line |
6 | Saraswat Nagar | Under Construction | None |
7 | National College (Bandra) | Under Construction | None |
8 | Bandra | Under Construction | Bandra on Western line |
9 | Income Tax Office (BKC) | Under Construction | Aqua Line 3 (Under Construction) |
10 | ILFS, BKC | Under Construction | None |
11 | MTNL, BKC | Under Construction | None |
12 | SG Barve Marg | Under Construction | None |
13 | Kurla (East) | Under Construction | None |
14 | Eastern Express Highway | Under Construction | Green Line 4 (Under Construction) |
15 | Chembur | Under Construction | Monorail |
16 | Diamond Garden | Under Construction | None |
17 | Shivaji Chowk (Chembur) | Under Construction | None |
18 | BSNL, Govandi | Under Construction | None |
19 | Mankhurd | Under Construction | None |
20 | Mandale | Under Construction | None |
Line-2B of Mumbai Metro Route Map
FAQs
Q. What is the expected date of opening for Mumbai Metro Line 2B?
A. Mumbai Metro Line 2B is expected to open to the public in 2023.
Q. How many stations are there on Mumbai Metro Line 2B?
A. There are a total of 10 stations on Mumbai Metro Line 2B.
Q. Is there an interchange station on Mumbai Metro Line 2B?
A. Yes, there is an interchange station at both DN Nagar and Ghatkopar West stations.
Q. What is the travel time on Mumbai Metro Line 2B?
A. The travel time on Mumbai Metro Line 2B is expected to be around 45 minutes.
Q. What is the fare for Mumbai Metro Line 2B?
A. Ans. Since the fares for Mumbai Metro Line 2B have not yet been disclosed, they are expected to be comparable to other metro lines.